1. Introduction
Over the past 100 years, the bus industry has come to be dominated by diesel powered buses due to their increasingly low cost and greater maturity of the technology. However, this comes at an environmental cost, for example, over 600 kt of CO
2 was emitted by London’s bus fleet in 2015 [
1]. It is these carbon emissions and their link to climate change that have provided one of the major drivers in recent years to develop and deploy alternative technologies for bus propulsion [
2]. Other emissions associated with diesel vehicles such as NO
x and particulates have provided a local driver to change due to their detrimental impacts on human health [
3–
5]. In 2008, it was estimated over 4000 deaths were brought forward as a result of long-term exposure to particulates in London [
6]. In order to combat these concerns, many cities have introduced measures such as the ‘low emission zone’ in London and emission control targets [
7]. London is to introduce the first ultra-low emissions zone (ULEZ) in 2020, which, amongst other targets will aim to replace conventional diesel powered buses with low emissions alternatives [
8,
9]. Despite this drive for change, it is evident that finding a replacement for diesel buses is not simple. In addition to the low cost, simplicity, reliability and maturity of the technology, diesels also offer excellent characteristics to meet the required power demands and operational needs of city buses. It can be seen from
Figure 1, the diesel engine that is a type of internal combustion engine (ICE) provides high output powers and uses energy dense fuel making them ideal for both the range and operating times expected of city buses and also for meeting the high transient power requirements during acceleration.
FIGURE 1.
Comparison of various technologies for the power and energy densities (based on Ref. [
10]).
In order to address the environmental concerns posed by diesel buses, a number of technologies are being investigated and implemented. The most widespread of these are diesel-hybrid buses, which make use of an on-board energy storage system to effectively recycle captured kinetic energy obtained through regenerative braking. Although hybrid buses are capable of significantly reducing fuel consumption, they are still reliant on diesel as the primary fuel source and hence do not address the fundamental problems associated with emission that come from using diesel as a fuel. As such, there has in recent years been an increased focus on the development of zero emissions buses, with two main competing technologies. These are battery electric buses and hydrogen fuel cell (FC), both of which exhibit zero operating emissions, hence eliminates the environmental and health issues associated with diesel buses [
11]. Such technology solutions are less mature and result in significant changes to the propulsion system. Although these technologies have been deployed in operational bus fleets, there remain a number of barriers to widespread deployment.
London has one of the most comprehensive and busiest public transport networks in the world, operated by Transport for London (TfL). There are over 9000 buses in operation [
12], which are estimated to account for 21% of the CO
2 emissions in London [
7], 63% of NO
x and 52% of PM
10particulate emissions [
13]. It is reported that the TfL bus fleet carries 6 million passengers each working day, which the number of bus passenger journeys grew by 64% between 2000 and 2013 and is continuing to increase [
14]. The Greater London Authority (GLA) has introduced a number of strategies in an attempt to reduce emissions from buses, part of which is the London hybrid bus project which aims to replace the conventional bus fleet with diesel hybrid buses [
7,
15]. This is to be furthered with the introduction of the ultra-low emissions zone (ULEZ) in 2020, which, amongst other targets will require all 3000 double-decker buses operating in the ULEZ to be diesel hybrid and all 300 single decker buses to be zero emissions [
8,
9,
16]. Since 2004, a number of technologies have been deployed as part of the operational bus fleet, as shown in
Figure 2, as a means of reducing emissions. London has been used as a case study throughout this chapter due to both the comprehensive bus network and the operational deployment of new technologies.
FIGURE 2.
Timeline of the milestones for the London low emission bus deployment.
Within this chapter, the development of low emission bus propulsion technologies will be discussed, through the evolution of diesel to diesel hybrid buses and onto the development and deployment of battery electric and FC buses. The aim is to outline the benefits of such technologies and the barriers that exist to their widespread implementation from both a technical and economic perspective. Part 2 discusses the implementation of diesel electric hybrid buses and their evolution from diesel buses. Parts 3 and 4 consider battery electric buses and fuel cell buses, respectively, whilst part 5 provides a comparison of these emerging technologies.
5. Comparison study
This part aims at to provide a comparison of the current state of low emission and zero emission bus systems. Diesel hybrid buses have been developed and deployed as a means of achieving emissions reductions, where a number of advantages in terms of efficiency, emissions and fuel consumption can be seen over diesel buses. There are, however, a number of problems associated with their widespread deployment. The first of these is the cost and is due to the additional components necessary for the electrical system. Second, the inclusion of the electrical system necessitates a significantly more complicated configuration [
19]. Third, although diesel hybrid buses can offer significant improvements in terms of CO
2 and NO
x emissions, the primary energy source is still the ICE. As such, they fail to address the underlying source of emissions and are therefore fundamentally limited in the improvements that can be achieved. As such, they can only really be considered as a transitional technology to reduce emissions but are not a viable option for meeting zero emissions targets. In order to meet the requirements for zero emissions buses, which is the ultimate objective for a clean transportation network, technologies such as electric and FC buses have been developed as a long term solution for city bus transportation needs. Therefore, this section will mainly compare the battery electric bus (opportunity, overnight and trolley) and FC bus technologies as the two most promising zero emission solutions in terms of the operational requirements and is summarised in
Table 4. The rankings are based on the authors’ opinions with reasoning given in the paragraphs below.
Zero emission option | Opportunity E-bus | Overnight E-bus | Trolley E-bus | Fuel cell bus |
Daily range | 4 | 3 | 1 | 2 |
Route flexibility | 3 | 1 | 4 | 1 |
Refuelling time | 2 | 3 | Not available | 1 |
Infrastructure | 3 | 2 | 4 | 1 |
Fuel availability | 1 | 1 | 1 | 4 |
Clean source | 1 | 1 | 1 | 4 |
Cost | 3 | 1 | 2 | 4 |
TABLE 4.
High level comparison of operational performance of zero emission bus concepts.
Range: Opportunity e-buses have a smaller energy storage that requires frequent recharging, which equates to poor performance in terms of daily range. Overnight e-buses utilise a much larger battery, which increases the range with reported values of over 300 km per charge. Trolley e-buses are continuously powered with electricity by overhead lines along the route which effectively gives unlimited range. FC buses use hydrogen cylinders as the fuel tanks, which allow the range to be greatly extended (up to 450 km) for as much as hydrogen fuel cylinder weight and size allows [
91].
Route flexibility: Opportunity and trolley e-buses require recharging infrastructures along the route which greatly limits their route flexibility. This is somewhat dependant on the size of the on-board battery and will likely be more acute for trolley e-buses. The overnight e-buses and FC buses are expected to be able to operate for an entire day’s service without recharging or refuelling. As such this allows for much greater route flexibility. This appears to be easily achieved for FC buses, however for overnight e-buses this is not always the case and will again be dependent on the size of the battery.
Refuelling time: Opportunity e-buses require frequent recharging throughout the entire route. Although each recharges for the opportunity e-bus only takes up to 15 minutes, it is still considered as a drawback due to the requirement for regular recharging. Overnight e-buses require a longer recharging time (average >4 hours) after each operation due to the increased battery capacity. The recharging time is heavily dependent on the charging power. Trolley e-buses are charged through overhead wires so that they require no refuelling time. FC buses are refuelled with gaseous hydrogen, which can be completed quickly (<10 minutes) [
91].
Infrastructure: Opportunity e-buses and trolley buses require corresponding infrastructure along the route and each end of the routes. Therefore, opportunity e-buses and trolley buses require a comprehensive infrastructure network. Overnight e-buses and FC buses both require infrastructure to recharge/refuel at the end of daily operation. This can, however, be centralised at the service depot and hence does not need to be as comprehensive. It appears, however, that the current recharging times for overnight e-buses presents a problem since it is likely that a significant number of recharging points and a massive recharging power would be needed to recharge the batteries of a large fleet in time for the next day’s service. This could potentially be an issue for the electrical grid infrastructure if the number of buses grows significantly, while this would not be a problem for FC buses because of their short refuelling time.
Fuel availability: All three battery electric bus technologies use electricity to recharge their batteries. This electricity could be central managed and distributed locally through the local electricity grids; however, widespread electric bus deployment could significantly stress this infrastructure. FC buses will likely require the development of a comprehensive distribution network for hydrogen, although on-site hydrogen production has been demonstrated. Additionally, hydrogen fuel storage would also create additional cost.
Clean source: Real zero emissions bus technology needs to be clean throughout the manufacturing process, fuel production and bus operation. Currently, battery electric and FC bus technologies can achieve zero operating emission but the lifetime emissions are much harder to quantify. It is hard to forecast how the emissions from new technology manufacturing will change, but the fuel production method can be roughly estimated. In the UK, the GHG emissions for electrical energy were 0.44932 kgCO
2/kWh in 2014 [
92]. This is likely to change as the UK’s energy mix changes, where in 2015, 24.6% of electricity was generated from renewable energy sources [
93]. Similarly, for FC buses, the source of hydrogen is critical in determining the overall emissions. Currently, about 96% of hydrogen is derived from fossil fuels [
94] which results in 13.7 kgCO
2/kgH
2 [
95]. Despite this, investigations into the use of renewable energy for hydrogen production through the process of electrolysis have been carried out offering potential for a low carbon source of hydrogen. Currently, electricity for battery electric buses is a cleaner fuel than hydrogen for FC buses.
Cost: Both electric and FC buses have higher capital costs than a conventional diesel bus; however, FC buses are currently far more expensive than electric buses. The capital cost of electric buses is somewhat dependant on the type of operation expected, where overnight buses will have higher costs than opportunity and trolley buses due to the increased battery capacity. This does, however, need to be weighed up against the cost of infrastructure, where opportunity and trolley buses require a comprehensive and expensive charging network. Overnight electric and FC buses on the other hand can make use of a centralised recharging/refuelling infrastructure.
Throughout this chapter, the main technologies being implemented to meet the low emissions requirements have been presented. The most promising for these in terms of zero emissions are electric and FC buses; however, it is clear that there are still significant barriers to their widespread implementation. Following on from the challenges identified in the comparison section a number of challenges for future developments have been identified.
For electric buses, it is clear that further improvements to battery technology are required in terms of their energy densities and lifetime as well as the development of an effective charging infrastructure. The challenges are somewhat dependant on whether the bus is intended to use the overnight or opportunity charging schemes. For overnight charging, the charging infrastructure can be centralised; however, this necessitates very large power requirements for the charging infrastructure, additionally the range of the buses needs to be addressed through battery developments. The opportunity charging schemes a comprehensive and distributed charging network. In most cases, this requires the development of high efficiency and power wireless charging technologies.
The future development of FC buses requires development in a broader range of areas. This includes further work on individual components such as the FC stack and hydrogen storage. The FC stack is still the most expensive component of the FC bus. The further development of the control strategies for hybridised buses held significant promise in reducing the size of the required FC stack and improving the fuel economy. Hydrogen storage is a key area for future research for bus applications, where technologies such as solid state storage offer potential to improve the storage density of hydrogen. For widespread implementation, the development of the hydrogen infrastructure is vital. This includes the production of hydrogen, particularly from clean sources, the distribution of hydrogen or on-site production and purification.